Loading the newest listings…
💡 Cold weather can reduce EV range and slow charging.
Loading the newest listings…
💡 Cold weather can reduce EV range and slow charging.
2024 BMW M4 · Lot 58907486 (COPART)
Registreeritud müüke
1
Viimane müük
$27,500
2026-07-20
Arve kokku (hinnang)
$32,108
→ Rotterdam
MÜÜDUD
2026-07-20
VIN WBS33BA03RCP04695 (lot 58907486, COPART) is a 2024 BMW M4 with 1 recorded salvage-auction sale (COPART) in the Leśniewski Auction archive. Most recently it sold for $27,500 on 2026-07-20 — FRONT END, 14,236 mi, —.
🔴 Tee pakkumine sarnastele sõidukitele — praegu oksjonil → BMW M4Näidis: tasude jaotus · COPART
LOT#: 58907486
VEHICLE: 2024 BMW M4
VIN: WBS33BA03RCP04695
Charges and Payments
| Date | Charges | Amount |
|---|---|---|
| 2026-07-20 | Sale Price | $27,500.00 |
| 2026-07-20 | Environmental Fee | $15.00 |
| 2026-07-20 | Internet Bid Fee | $160.00 |
| 2026-07-20 | Gate Fee | $95.00 |
| 2026-07-20 | Title Pickup Fee | $20.00 |
| 2026-07-20 | Buyer Fee | $2,063.00 |
| Total (USD) | $29,853.00 |
Hinnangulised oksjonimaja tasud sellel haamrihinnal (ostjatasu, pakkumistasu, värava-/teenustasu, keskkonna- ja dokumenditasu). Tegelik arve sõltub kliendiklassist ja lisateenustest.
2024 BMW M4 (VIN WBS33BA03RCP04695) last sold at COPART on 2026-07-20 for $27,500 — FRONT END, 14,236 mi, —.
The most recent recorded auction sale was 2026-07-20. This VIN has 1 recorded sale in the Leśniewski Auction archive.
The most recent Leśniewski Auction record lists VIN WBS33BA03RCP04695 (2024 BMW M4) with title/document "Ny - Mv-907A Salvage Certificate" and FRONT END damage — Poland export status: OK.
At the last recorded final bid of $27,500, a 2024 BMW M4 like this is roughly $32,108 landed at Rotterdam via Leśniewski Auction — winning bid plus auction fees, a flat $295–$395 commission, US land transport and ocean freight — before the 10% EU import duty, Polish akcyza excise where applicable, and import VAT.
2021 BMW M4
$22,500
2026-07-30 · WBS53AZ08MCH00807
2016 BMW
$525
2026-07-30 · WBA3R5C57GK373040
2018 BMW 3 series
$1,750
2026-07-30 · WBA8A3C51JA488618
2012 BMW X5
$1,350
2026-07-30 · 5UXZV4C5XCL766455
2020 BMW X3
$21,500
2026-07-30 · 5YMTS0C07L9B47347
2020 BMW 3 series
$5,900
2026-07-30 · 3MW5R1J07L8B07778
2020 BMW 5 series
$14,200
2026-07-30 · WBAJR3C00LCE55117
2014 BMW
$3,950
2026-07-30 · WBA3N3C55EF711184