Loading the newest listings…
💡 EVs can be more efficient in city traffic than at steady highway speeds.
Loading the newest listings…
💡 EVs can be more efficient in city traffic than at steady highway speeds.
2024 BMW M4 · Lot 52660956 (COPART)
Registreeritud müüke
1
Viimane müük
$19,000
2026-07-22
Arve kokku (hinnang)
$22,650
→ Rotterdam
MÜÜDUD
2026-07-22
VIN WBS43AZ00RCR66158 (lot 52660956, COPART) is a 2024 BMW M4 with 1 recorded salvage-auction sale (COPART) in the Leśniewski Auction archive. Most recently it sold for $19,000 on 2026-07-22 — FRONT END, 12,887 mi, Waco, TX.
🔴 Tee pakkumine sarnastele sõidukitele — praegu oksjonil → BMW M4Näidis: tasude jaotus · COPART
LOT#: 52660956
VEHICLE: 2024 BMW M4
VIN: WBS43AZ00RCR66158
Charges and Payments
| Date | Charges | Amount |
|---|---|---|
| 2026-07-22 | Sale Price | $19,000.00 |
| 2026-07-22 | Environmental Fee | $15.00 |
| 2026-07-22 | Internet Bid Fee | $160.00 |
| 2026-07-22 | Gate Fee | $95.00 |
| 2026-07-22 | Title Pickup Fee | $20.00 |
| 2026-07-22 | Buyer Fee | $1,425.00 |
| Total (USD) | $20,715.00 |
Hinnangulised oksjonimaja tasud sellel haamrihinnal (ostjatasu, pakkumistasu, värava-/teenustasu, keskkonna- ja dokumenditasu). Tegelik arve sõltub kliendiklassist ja lisateenustest.
2024 BMW M4 (VIN WBS43AZ00RCR66158) last sold at COPART on 2026-07-22 for $19,000 — FRONT END, 12,887 mi, Waco, TX.
The most recent recorded auction sale was 2026-07-22. This VIN has 1 recorded sale in the Leśniewski Auction archive.
The most recent Leśniewski Auction record lists VIN WBS43AZ00RCR66158 (2024 BMW M4) with title/document "NC - SALVAGE CERTIFICATE OF TITLE" and FRONT END damage — Poland export status: OK.
At the last recorded final bid of $19,000, a 2024 BMW M4 like this is roughly $22,650 landed at Rotterdam via Leśniewski Auction — winning bid plus auction fees, a flat $295–$395 commission, US land transport and ocean freight — before the 10% EU import duty, Polish akcyza excise where applicable, and import VAT.
2013 BMW X5
$425
2026-07-31 · 5UXZV4C57D0B06346
2020 BMW X2
$300
2026-07-31 · WBXYH9C01L5P35320
2009 BMW X6
$2,500
2026-07-31 · 5UXFG83579LZ92515
2019 BMW
$7,600
2026-07-31 · 5UXTR9C56KLP93254
2016 BMW
$2,200
2026-07-31 · WBA1K9C52GV322367
2013 BMW
$500
2026-07-31 · 5UXWX9C56D0A08791
2013 BMW X1
$725
2026-07-31 · WBAVL1C54DVR92482
2020 BMW M340i
$14,800
2026-07-31 · WBA5U9C03LFH42288