Loading the newest listings…
💡 Regenerative braking turns the electric motor into a generator while slowing down.
Loading the newest listings…
💡 Regenerative braking turns the electric motor into a generator while slowing down.
2026 BMW M5 · Lot 44664196 (IAAI)
Registreeritud müüke
1
Viimane müük
$30,250
2026-07-27
Arve kokku (hinnang)
$35,954
→ Rotterdam
MÜÜDUD
2026-07-27
VIN WBS83FK07TCV57980 (lot 44664196, IAAI) is a 2026 BMW M5 with 1 recorded salvage-auction sale (IAAI) in the Leśniewski Auction archive. Most recently it sold for $30,250 on 2026-07-27 — LEFT & RIGHT, 7,011 mi, Gardena, CA.
🔴 Tee pakkumine sarnastele sõidukitele — praegu oksjonil → BMW M5Näidis: tasude jaotus · IAA
| StockNo | Sale Item # | Year | Make | Model | Color | Mileage | VIN |
|---|---|---|---|---|---|---|---|
| 44664196 | — | 2026 | BMW | M5 | — | 7,011 | WBS83FK07TCV57980 |
| Description | Charges | Payments |
|---|---|---|
| Bid Amount | $30,250.00 | |
| Buyer Fee | $2,269.00 | |
| Service Fee | $105.00 | |
| Title Handling Fee | $20.00 | |
| Internet Fee | $160.00 | |
| Environmental Fee | $15.00 | |
| Total (USD) | $32,819.00 |
Hinnangulised oksjonimaja tasud sellel haamrihinnal (ostjatasu, pakkumistasu, värava-/teenustasu, keskkonna- ja dokumenditasu). Tegelik arve sõltub kliendiklassist ja lisateenustest.
2026 BMW M5 (VIN WBS83FK07TCV57980) last sold at IAAI on 2026-07-27 for $30,250 — LEFT & RIGHT, 7,011 mi, Gardena, CA.
The most recent recorded auction sale was 2026-07-27. This VIN has 1 recorded sale in the Leśniewski Auction archive.
The most recent Leśniewski Auction record lists VIN WBS83FK07TCV57980 (2026 BMW M5) with title/document "Salvage Title" and LEFT & RIGHT damage.
At the last recorded final bid of $30,250, a 2026 BMW M5 like this is roughly $35,954 landed at Rotterdam via Leśniewski Auction — winning bid plus auction fees, a flat $295–$395 commission, US land transport and ocean freight — before the 10% EU import duty, Polish akcyza excise where applicable, and import VAT.
2016 BMW 4er
$3,050
2026-07-31 · WBA4A9C51GG695212
2022 BMW M3
$15,300
2026-07-31 · WBS43AY04NFM22983
2013 BMW X5
$600
2026-07-31 · 5UXZV8C51D0C16431
2019 BMW
$21,600
2026-07-31 · 5UXCR6C53KLK85256
2016 BMW 3er
$1,750
2026-07-31 · WBA8E3G57GNT26119
2022 BMW M4
$13,400
2026-07-31 · WBS43AZ08NCK30336
2004 BMW 3 series
$325
2026-07-31 · WBAAZ33474KP84811
2009 BMW X5
$775
2026-07-31 · 5UXFE83529L169609