Loading the newest listings…
💡 A strong passenger compartment is meant to preserve survival space in a crash.
Loading the newest listings…
💡 A strong passenger compartment is meant to preserve survival space in a crash.
2024 BMW M4 · Lot 52660956 (COPART)
Ventes enregistrées
1
Dernière vente
$19,000
2026-07-22
Facture totale est.
$22,650
→ Rotterdam
VENDU
2026-07-22
VIN WBS43AZ00RCR66158 (lot 52660956, COPART) is a 2024 BMW M4 with 1 recorded salvage-auction sale (COPART) in the Leśniewski Auction archive. Most recently it sold for $19,000 on 2026-07-22 — FRONT END, 12,887 mi, Waco, TX.
🔴 Enchérissez sur des véhicules similaires — en direct → BMW M4Exemple de détail des frais · COPART
LOT#: 52660956
VEHICLE: 2024 BMW M4
VIN: WBS43AZ00RCR66158
Charges and Payments
| Date | Charges | Amount |
|---|---|---|
| 2026-07-22 | Sale Price | $19,000.00 |
| 2026-07-22 | Environmental Fee | $15.00 |
| 2026-07-22 | Internet Bid Fee | $160.00 |
| 2026-07-22 | Gate Fee | $95.00 |
| 2026-07-22 | Title Pickup Fee | $20.00 |
| 2026-07-22 | Buyer Fee | $1,425.00 |
| Total (USD) | $20,715.00 |
Frais de la maison de vente estimés à ce prix d'adjudication (frais acheteur, frais d'enchère, frais de sortie/service, taxe environnementale et titre). La facture réelle varie selon le palier et les options.
2024 BMW M4 (VIN WBS43AZ00RCR66158) last sold at COPART on 2026-07-22 for $19,000 — FRONT END, 12,887 mi, Waco, TX.
The most recent recorded auction sale was 2026-07-22. This VIN has 1 recorded sale in the Leśniewski Auction archive.
The most recent Leśniewski Auction record lists VIN WBS43AZ00RCR66158 (2024 BMW M4) with title/document "NC - SALVAGE CERTIFICATE OF TITLE" and FRONT END damage — Poland export status: OK.
At the last recorded final bid of $19,000, a 2024 BMW M4 like this is roughly $22,650 landed at Rotterdam via Leśniewski Auction — winning bid plus auction fees, a flat $295–$395 commission, US land transport and ocean freight — before the 10% EU import duty, Polish akcyza excise where applicable, and import VAT.
2024 BMW X1
$18,200
2026-07-31 · WBX13EF03R5Y11844
2016 BMW X5
$2,500
2026-07-30 · 5UXKR0C52G0P25291
2013 BMW X3
$725
2026-07-30 · 5UXWX7C53DL981529
2022 BMW X6
$35,750
2026-07-30 · 5UXCY6C08N9L59277
2013 BMW X5
$1,200
2026-07-30 · 5UXZV8C55D0C15993
2013 BMW X5
$625
2026-07-30 · 5UXZV8C50D0C14511
2017 BMW X5
$3,250
2026-07-30 · 5UXKR0C32H0V75733
2013 BMW X3
$550
2026-07-30 · 5UXWX7C5XDL979583