Loading the newest listings…
💡 A plug-in hybrid uses both a rechargeable battery and a combustion engine.
Loading the newest listings…
💡 A plug-in hybrid uses both a rechargeable battery and a combustion engine.
2023 BMW M3 · Lots 45392322 (IAAI)
Reģistrētās pārdošanas
1
Pēdējā pārdošana
$31,200
2026-07-30
Kopējais rēķins (apt.)
$35,835
→ Rotterdam
PĀRDOTS
2026-07-30
VIN WBS43AY02PFN85456 (lot 45392322, IAAI) is a 2023 BMW M3 with 1 recorded salvage-auction sale (IAAI) in the Leśniewski Auction archive. Most recently it sold for $31,200 on 2026-07-30 — RIGHT SIDE, 56,134 mi, Dream Rides, LA.
🔴 Solī par līdzīgiem auto — tagad aktīvi → BMW M3Maksu piemērs · IAA
| StockNo | Sale Item # | Year | Make | Model | Color | Mileage | VIN |
|---|---|---|---|---|---|---|---|
| 45392322 | — | 2023 | BMW | M3 | — | 56,134 | WBS43AY02PFN85456 |
| Description | Charges | Payments |
|---|---|---|
| Bid Amount | $31,200.00 | |
| Buyer Fee | $2,340.00 | |
| Service Fee | $105.00 | |
| Title Handling Fee | $20.00 | |
| Internet Fee | $160.00 | |
| Environmental Fee | $15.00 | |
| Total (USD) | $33,840.00 |
Aptuvenās izsoles nama maksas pie šīs cenas (pircēja maksa, solīšanas maksa, vārtu/servisa, vides un dokumentu maksa). Faktiskais rēķins atšķiras atkarībā no pircēja līmeņa un papildpakalpojumiem.
2023 BMW M3 (VIN WBS43AY02PFN85456) last sold at IAAI on 2026-07-30 for $31,200 — RIGHT SIDE, 56,134 mi, Dream Rides, LA.
The most recent recorded auction sale was 2026-07-30. This VIN has 1 recorded sale in the Leśniewski Auction archive.
The most recent Leśniewski Auction record lists VIN WBS43AY02PFN85456 (2023 BMW M3) with title/document "Salvage (Louisiana)" and RIGHT SIDE damage.
At the last recorded final bid of $31,200, a 2023 BMW M3 like this is roughly $35,835 landed at Rotterdam via Leśniewski Auction — winning bid plus auction fees, a flat $295–$395 commission, US land transport and ocean freight — before the 10% EU import duty, Polish akcyza excise where applicable, and import VAT.
2016 BMW X5
$2,500
2026-07-30 · 5UXKR0C52G0P25291
2017 BMW X5
$3,250
2026-07-30 · 5UXKR0C32H0V75733
2013 BMW X3
$550
2026-07-30 · 5UXWX7C5XDL979583
2019 BMW 3er
$5,300
2026-07-30 · WBA5R1C54KAK06621
2016 BMW 3er
$2,600
2026-07-30 · WBA8E9C59GK643698
2017 BMW 3er
$3,850
2026-07-30 · WBA8K3C50HK678878
2018 BMW
$8,100
2026-07-30 · WBAJV6C54JBK07879
2018 BMW
$15
2026-07-30 · WBXHT3C33J5K30771